Status: Approved
Timeframe: 2022-?
Area: Bangladesh, Narayanganj District, Dudhghata, Korbanpur and Chanderchak villages
AIIB Investment Amount: US$ 110 million
Total Project Cost: US$ 613 million
Co-financier: Deutsche Investitions- und Entwicklungsgesellschaft (DEG), OPEC Fund, and Standard Chartered Bank (with Swiss Export Risk Insurance (SERV) providing policy cover to Standard Chartered Bank)
E&S Category: A
Project Details: The Project involves the design, financing, engineering, construction, operation, and maintenance of a 584-megawatt (MW) greenfield gas-fired combined-cycle gas turbine (CCGT) plant on a Build-Own-Operate (BOO) basis, to be implemented as an Independent Power Producer (IPP) facility.
Capacity: 584-megawatt (MW)
Construction Company: Unique Meghnaghat Power Limited (UMPL)
Resettlement: Total 21.07 acres of mostly single crop agricultural land has been directly procured from the local villages based on one-to-one negotiation for setting up the project. Based on a review of the UHRL’s Annual Report, it is evident that the local people did not receive fair compensation in exchange for their land, which was not valued at current market rates, let alone at adjusted rates to take into consideration the implied long term losses to family income that could have been generated through the use of the land.
CSO reports: Recourse and partners Case Study
Organizations monitoring: BWGED
Further information: AIIB Page
Last update: 31.12.2023
Kontakt

Dr. Nora Sausmikat
China desk/Campaigns on Multilateral Development Banks
nora.sausmikat [at] urgewald.org
+49 030 86329 22 32

Dr. Dustin Schäfer
Team Lead Campaigns Multilateral Financial Institutions
dustin [at] urgewald.org